PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Site Construction Works Monitoring for Rehabilitation and Upgrading of Morogoro Water Treatment Plant
PROJECT LOCATION:
Mambogo Water Treatment Plant
Morogoro, Tanzania
NAME OF CLIENT:
MORUWASA and Nicholas O’ Dwyer – Main Consultant
PROJECT DURATION:
April 2011 – October 2012
PROJECT FINANCIER:
Millennium Challenge Account Tanzania – MCAT &
The Government of Tanzania
PROJECT COST:
USD. 16, 000, 000.00
PROJECT DESCRIPTION:
Upon the appointment for Design and Building Contract for The Rehabilitation and Upgrading of Morogoro Water Treatment Plant by the Millennium Challenge Account – Tanzania and The Government of The United Republic of Tanzania as the Project Financier, MORUWASA and Nicholas O’ Dwyer as The Main Consultant for the project, it was decided that The Whole Water Treatment Plant and Facilities should be Re-Surveyed and appraised for the future use by the people of Morogoro Township based on the provided future population demand for clean water supply.
From the survey it was revealed that above 75% of the existing Old Facilities were Worn-Out and need immediate replacement. based on the capacity and tolerance to stability. The Facilities Survey was based on The Assessment for The State and Structural Integrity in the relations to the future demand for water supply to the projected population of the people in Morogoro Town. From this Assessment and Survey New Water Treatment Plant Structures were proposed for the design in order to meet the future demand for water supply in Morogoro Township.
The New structures proposed were designed for adequate water processing capacity and efficiency as part of the improvements for future supply of water based on the projected demand of users in Morogoro Town. After the Detailed Assessment of State and Structural Integrity of existing Water Treatment Structures, Water and Process Engineers who are the experts in Water Treatment Plants designed New Reinforced Concrete Facilities for the Expansion and Rehabilitation.
The design proposal was submitted to Nicholas O’ Dwyer as Main Consultant in Water Treatment Plant and ESM Consulting Engineers Co. Ltd as The Local Civil and Structures Engineer for the Project. All the Civil and Structures Designs were conducted in Tanzania by the Local Consultant and later submitted to The Main Consultant for Design Review and Approval. After the design was completed, full packages of Engineering Drawings, Bar Bending Schedules and Specifications were produced for construction of the Water Treatment Structures.
SCOPE OF WORK:
• Feasibility Study
• Preliminary Design
• Detailed Design
• Tender Management
• Site Construction Works Monitoring
• Quality Control of Site Works and Construction Material




PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Site Construction Works Monitoring for Rehabilitation and Upgrading of Morogoro Water Treatment Plant
PROJECT LOCATION:
Mambogo Water Treatment Plant
Morogoro, Tanzania
NAME OF CLIENT:
MORUWASA and Nicholas O’ Dwyer – Main Consultant
PROJECT DURATION:
April 2011 – October 2012
PROJECT FINANCIER:
Millennium Challenge Account Tanzania – MCAT &
The Government of Tanzania
PROJECT COST:
USD. 16, 000, 000.00
PROJECT DESCRIPTION:
Upon the appointment for Design and Building Contract for The Rehabilitation and Upgrading of Morogoro Water Treatment Plant by the Millennium Challenge Account – Tanzania and The Government of The United Republic of Tanzania as the Project Financier, MORUWASA and Nicholas O’ Dwyer as The Main Consultant for the project, it was decided that The Whole Water Treatment Plant and Facilities should be Re-Surveyed and appraised for the future use by the people of Morogoro Township based on the provided future population demand for clean water supply.
From the survey it was revealed that above 75% of the existing Old Facilities were Worn-Out and need immediate replacement. based on the capacity and tolerance to stability. The Facilities Survey was based on The Assessment for The State and Structural Integrity in the relations to the future demand for water supply to the projected population of the people in Morogoro Town. From this Assessment and Survey New Water Treatment Plant Structures were proposed for the design in order to meet the future demand for water supply in Morogoro Township.
The New structures proposed were designed for adequate water processing capacity and efficiency as part of the improvements for future supply of water based on the projected demand of users in Morogoro Town. After the Detailed Assessment of State and Structural Integrity of existing Water Treatment Structures, Water and Process Engineers who are the experts in Water Treatment Plants designed New Reinforced Concrete Facilities for the Expansion and Rehabilitation.
The design proposal was submitted to Nicholas O’ Dwyer as Main Consultant in Water Treatment Plant and ESM Consulting Engineers Co. Ltd as The Local Civil and Structures Engineer for the Project. All the Civil and Structures Designs were conducted in Tanzania by the Local Consultant and later submitted to The Main Consultant for Design Review and Approval. After the design was completed, full packages of Engineering Drawings, Bar Bending Schedules and Specifications were produced for construction of the Water Treatment Structures.
SCOPE OF WORK:
• Feasibility Study
• Preliminary Design
• Detailed Design
• Tender Management
• Site Construction Works Monitoring
• Quality Control of Site Works and Construction Material



PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Site Construction Works Monitoring for The Expansion and Upgrading of Iringa Water Treatment Plant
PROJECT LOCATION:
Iringa Water Treatment Plant
Iringa, Tanzania
NAME OF CLIENT:
Iringa Water Supply and Sanitation Authority &
PROJECT FINANCIER:
The Government of The United Republic of Tanzania
PROJECT DURATION:
March 2019 – June 2020
PROJECT COST:
USD. 3, 500, 000.00
PROJECT DESCRIPTION:
In the Year 2018, The Management of Iringa Water Supply and Sanitation Authority under the supervision of The Government of The United Republic of Tanzania as the Project Financier conducted Detailed Assessment for the Performance of the Existing Water Treatment Plant in relationship to the current demand of the population of Iringa. From the assessment it was realized that the current population is in higher demand for supply of clean water compared to the supply currently available from Iringa Water Supply and Sanitation Authority.
From the assessment, the authority decided to make a proposal for the extension of the existing Infrastructure in order to meet with the current demand of the population of Iringa Municipality. Besides Water Treatment Plant and Processing Engineers, ESM Consulting Engineers Co. Ltd was appointed as the Civil and Structures Engineer who will provide Detailed Design and Preparation of Tender Documents for the proposed Expansion and Upgrading of Iringa Water Treatment Plant for Iringa Water Supply and Sanitation Authority in the township of Iringa.
Among the Facilities for Water Treatment Plant, which were under the program for Expansion and Upgrading were:
• Filtration Tank
• Flocculation Tank
• Clean Water Storage Tanks
• Pipeline and Supports for supply to end users
SCOPE OF WORK:
In this assignment ESM Consulting Engineers Co. Ltd was involved in the scope of consultancy briefly described below:
• Feasibility Study
• Preliminary Design
• Detailed Design
• Preparation of Tender Documents
• Site Construction Works Monitoring
• Quality Control of Site Works and Construction Material



PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Site Construction Works Monitoring for The Expansion and Upgrading of Iringa Water Treatment Plant
PROJECT LOCATION:
Iringa Water Treatment Plant
Iringa, Tanzania
NAME OF CLIENT:
Iringa Water Supply and Sanitation Authority &
PROJECT FINANCIER:
The Government of The United Republic of Tanzania
PROJECT DURATION:
March 2019 – June 2020
PROJECT COST:
USD. 3, 500, 000.00
PROJECT DESCRIPTION:
In the Year 2018, The Management of Iringa Water Supply and Sanitation Authority under the supervision of The Government of The United Republic of Tanzania as the Project Financier conducted Detailed Assessment for the Performance of the Existing Water Treatment Plant in relationship to the current demand of the population of Iringa. From the assessment it was realized that the current population is in higher demand for supply of clean water compared to the supply currently available from Iringa Water Supply and Sanitation Authority.
From the assessment, the authority decided to make a proposal for the extension of the existing Infrastructure in order to meet with the current demand of the population of Iringa Municipality. Besides Water Treatment Plant and Processing Engineers, ESM Consulting Engineers Co. Ltd was appointed as the Civil and Structures Engineer who will provide Detailed Design and Preparation of Tender Documents for the proposed Expansion and Upgrading of Iringa Water Treatment Plant for Iringa Water Supply and Sanitation Authority in the township of Iringa.
Among the Facilities for Water Treatment Plant, which were under the program for Expansion and Upgrading were:
• Filtration Tank
• Flocculation Tank
• Clean Water Storage Tanks
• Pipeline and Supports for supply to end users
SCOPE OF WORK:
In this assignment ESM Consulting Engineers Co. Ltd was involved in the scope of consultancy briefly described below:
• Feasibility Study
• Preliminary Design
• Detailed Design
• Preparation of Tender Documents
• Site Construction Works Monitoring
• Quality Control of Site Works and Construction Material



PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Site Construction Works Monitoring for Construction of New Water intake Structure for Kigoma City Council
PROJECT LOCATION:
Kigoma Water Intake
Kigoma, Tanzania
NAME OF CLIENT:
Kigoma Water Supply and Sanitation Authority
PROJECT FINANCIER:
The Government of The United Republic of Tanzania
PROJECT DURATION:
January 2020 – December 2020
PROJECT COST:
USD. 1, 200, 000.00
PROJECT DESCRIPTION:
In the Year 2020, The Management of Kigoma Water Supply and Sanitation Authority under the supervision of The Government of The United Republic of Tanzania as the Project Financier conducted Detailed Assessment of Performance of the Existing Water Intake Structure for in relationship to the current demand of the population of Kigoma. From the assessment it was realized that the current Water Intake Structure does not provide adequate supply for Water to the Treatment Plant according to the population demand. The population demand for the supply of clean water has been found t be very high compared to the supply currently available from Kigoma Water Supply and Sanitation Authority.
From the assessment, the authority decided to make a proposal for the construction of New Water Intake Infrastructures in order to meet with the current demand of the population of Kigoma Municipality. Besides Water Treatment Plant and Processing Engineers, ESM Consulting Engineers Co. Ltd was appointed as the Civil and Structures Engineer who will provide Detailed Design and Preparation of Tender Documents for the proposed New Construction of Intake Structure for supply to Kigoma Water Treatment Plant for Kigoma Water Supply and Sanitation Authority in the township of Kigoma.
Water Intake Facilities for Supply to Water Treatment Plant, which were under the program for New Construction were:
• Reinforced Concrete Raw Water Intake Structure
• Reinforced Concrete Slippers for Support of Pipeline from Water Source to Intake Structure
• Reinforced Concrete Slippers for Support of Pipeline from Intake Structure to Water Treatment Plant
SCOPE OF WORK:
In this assignment ESM Consulting Engineers Co. Ltd was involved in the scope of consultancy briefly described below:
• Feasibility Study
• Preliminary Design
• Detailed Design
• Preparation of Tender Documents
• Site Construction Works Monitoring
• Quality Control of Site Works and Construction Material



PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Site Construction Works Monitoring for Construction of New Water intake Structure for Kigoma City Council
PROJECT LOCATION:
Kigoma Water Intake
Kigoma, Tanzania
NAME OF CLIENT:
Kigoma Water Supply and Sanitation Authority
PROJECT FINANCIER:
The Government of The United Republic of Tanzania
PROJECT DURATION:
January 2020 – December 2020
PROJECT COST:
USD. 1, 200, 000.00
PROJECT DESCRIPTION:
In the Year 2020, The Management of Kigoma Water Supply and Sanitation Authority under the supervision of The Government of The United Republic of Tanzania as the Project Financier conducted Detailed Assessment of Performance of the Existing Water Intake Structure for in relationship to the current demand of the population of Kigoma. From the assessment it was realized that the current Water Intake Structure does not provide adequate supply for Water to the Treatment Plant according to the population demand. The population demand for the supply of clean water has been found t be very high compared to the supply currently available from Kigoma Water Supply and Sanitation Authority.
From the assessment, the authority decided to make a proposal for the construction of New Water Intake Infrastructures in order to meet with the current demand of the population of Kigoma Municipality. Besides Water Treatment Plant and Processing Engineers, ESM Consulting Engineers Co. Ltd was appointed as the Civil and Structures Engineer who will provide Detailed Design and Preparation of Tender Documents for the proposed New Construction of Intake Structure for supply to Kigoma Water Treatment Plant for Kigoma Water Supply and Sanitation Authority in the township of Kigoma.
Water Intake Facilities for Supply to Water Treatment Plant, which were under the program for New Construction were:
– Reinforced Concrete Raw Water Intake Structure
• Reinforced Concrete Slippers for Support of Pipeline from Water Source to Intake Structure
• Reinforced Concrete Slippers for Support of Pipeline from Intake Structure to Water Treatment Plant
SCOPE OF WORK:
In this assignment ESM Consulting Engineers Co. Ltd was involved in the scope of consultancy briefly described below:
• Feasibility Study
• Preliminary Design
• Detailed Design
• Preparation of Tender Documents
• Site Construction Works Monitoring
• Quality Control of Site Works and Construction Material